product

 Home » Products » Liquid Filler » YG4/2/2-100 Eyedrop Aseptic Filling Production Line

YG4/2/2-100 Eyedrop Aseptic Filling Production Line

The prooduction line of the eye drops is mainly to the completion of the eye drops bottle Unscrambler,bottle conveying, air wash, metering packaging, plus stuffed inside and outside screw etc processed.

System components
  • Store quantities of bottles, automatic unscrambling system
  • Convoy bottle, reject inverted bottle system
  • Static elimination, air washing
  • Precision Ceramics, bottle indexing system
  • Vacuum pick and auto place system
  • Constant magnetic torque, positioning capping system
  • Aseptic laminar flow protection system
  • Altemative peristaltic pump system instead of ceramic pump


Main technical parameter

Bottle used

5-30ml plastic bottle

Production capacity

90-120bpm

Filling nozzles

4

Bottle air washing heads

12

Plug placing heads

2

Capping heads

2

Filling precision

≤±1%

Qualified bottle air washing

100%

Qualified plug placing

≥99.8%

Qualified cap screwing

≥99.8%

Compressed air required

10m³/h 0.6-0.8MPa

Total power

≤5KW 380V(220V) 50HZ

Net weight

3000KG

Overall dimension

6780*2380*2000(Exclude LAF)


Welcome to our website! Please send your words at any time in the following form and ask us, we will contact you and provide you with the corresponding service as soon as possible. Please write in English.

YG8/4 Eight Pumps Filling and Capping Monobloc

Learn More

ZHYG Linear overflow filling machine

Learn More

AV Automatic viscosity filling machine

Learn More

AY Automatic Oil Filling Machine

Learn More